Request For Proposals For Advancing Critical Improvements at Saint Paul Harbor

March 16, 2026 

Summary: As part of the City of Saint Paul’s (“City”) broader harbor improvement and expansion goals, grant funding has been secured for the planning, design, and preconstruction of two interrelated core components:

Component 1: Planning for City South Dock Renovation & New Berthing Dolphins

Component 2: Planning for City South Dock Utilities, Realignment of Harbor Road, Renovation & Expansion of City North Docks & Piers, and New & Relocated Harbor Master Office

The City issues this request for proposals (“RFP”) for a qualified engineering / consulting Firm (“Firm”) to provide design services, environmental review, survey work, and preparation of construction bid documents, among other tasks, for both Components. While this RFP is for planning multiple project components and includes several sources of funding, the City intends to negotiate and execute one contract with the selected Firm to perform the entire Scope of Work and complete all deliverables noted herein. This RFP includes preconstruction work, including 100% design with cost estimate, environmental review, and preparation of construction bid documents, for Component 2. This design work should be completed alongside the preliminary design for Component 1, as it is not contingent upon NEPA approval. Construction, installation, and long-term maintenance are not included in this RFP and will be procured under future contracts.

Bids will not be accepted without registration.

All notifications regarding RFPs, including changes, will be posted here and emailed only to registered vendors/firms.

Bids will not be accepted without registration. To be considered, proposals must be received via email no later than April 30, 2026 at 5:00pm Alaska Standard Time. Electronic proposals should be in a single PDF format and sent by email to pazavadil@stpaulak.com with the subject line “Bid to RFP 26-03.

If you have any questions concerning this request, please contact Jodi Plante
at (907) 321-7663 or jodi@akml.org

REQUEST FOR PROPOSAL SCHEDULE
Release of RFP:March 16, 2026
Pre-Bid Question & Answer Conference

April 6, 2026 (10:00am AKST) via Zoom

https://us02web.zoom.us/j/89769381823?pwd=TeEKuKmV46NlLTB1RtMEQ0F65tsMCQ.1

Meeting ID: 897 6938 1823
Passcode: 968015

Questions & Clarification DeadlineApril 9, 2026 (5:00pm AKST)
Proposals Due:April 30, 2026 (5:00pm AKST)
Review & Selection of FirmMay 15, 2026
Negotiation of ContractMay 29, 2026

Download the RFP

Register to receive notice when details of this RFP are updated. Vendors must be registered to be considered for this project.
 

Register as an Interested Vendor for this project 


Question and Answer section for RFP 26-03.


March 19, 2026

March 20, 2026

A: This RFP is for professional engineering/planning services under a design-bid-build approach. See Section IV. Scope of Services, A. (page 9), and Section IX. Funding Agency Requirements (page 20, 2nd paragraph).

A: The City confirmed with USDOT MARAD that the Brooks Act does not apply to PIDP or BUILD grant programs. It used to but they changed that in FY21.  Certain FHWA projects (such as INFRA) do still reference Brooks Act. We are not required to consider price.  It is acceptable that we can base selection on experience and negotiate price during contract negotiations.

A: All federally funded grants come under BABAA and even thought this is a US DOT project, it utilizes EPA Best Practices Guide for Procurement Services.  It is Attachment O in the RFP.

March 23, 2026

A: No, they are not available.  Obtaining and reviewing historical drawings and details on the dock is expected to be part of the process for the selected firm.

A:  We received this comment from more than one firm. The City decided to issue Amendment 1 on March 23, 2026 to remove the bid bond requirement from this RFP.


 
Answer has been edited since originally posted.